SUNKWH Microgrid

This integrated microgrid system cuts electricity costs and reduces carbon emissions by making full use of clean solar energy.

MANUFACTURING

Eight—step Process from Battery Modules to Energy Storage System

Eight core processes with in‑house manufacturing and quality inspection throughout the whole workflow.

Cell Sorting 01

Cell Sorting

Sort incoming cells by grade to ensure cell consistency

Cell Grouping 02

Cell Grouping

Stack and press cells to form cell groups

Module Loading 03

Module Loading

Lift assembled modules into the PACK cabinet

Laser Welding 04

Laser Welding

Conduct visual positioning inspection, then place busbars for laser welding

BMS & Electrical Component Installation 05

BMS & Electrical Component Installation

Install pre-processed BMS protection boards and electrical components inside the battery cabinet

(EOL) Testing 06

(EOL) Testing

Perform battery communication test, voltage internal resistance test and air-tightness test to guarantee battery reliability

Aging Test 07

Aging Test

Carry out charge-discharge tests for real-time simulation of operating conditions

Quality Inspection & Packaging 08

Quality Inspection & Packaging

Conduct packaging and warehousing upon passing quality inspection

Cell Sorting 01

Cell Sorting

Sort incoming cells by grade to ensure cell consistency

Cell Grouping 02

Cell Grouping

Stack and press cells to form cell groups

Module Loading 03

Module Loading

Lift assembled modules into the PACK cabinet

Laser Welding 04

Laser Welding

Conduct visual positioning inspection, then place busbars for laser welding

BMS & Electrical Component Installation 05

BMS & Electrical Component Installation

Install pre-processed BMS protection boards and electrical components inside the battery cabinet

(EOL) Testing 06

(EOL) Testing

Perform battery communication test, voltage internal resistance test and air-tightness test to guarantee battery reliability

Aging Test 07

Aging Test

Carry out charge-discharge tests for real-time simulation of operating conditions

Quality Inspection & Packaging 08

Quality Inspection & Packaging

Conduct packaging and warehousing upon passing quality inspection

SUNKWH C&I Energy Storage ESS

项目案例
PV energy storage project
Installed Capacity: 1039.6kW ESS: 1145kWh
项目1
Installed Capacity: 1039.6kW ESS: 1145kWh
项目2
Installed Capacity: 599.68kW ESS: 783kWh
项目
ESS:261kWh
项目
ESS: 2334kWh

SUNKWH Residential ESS

Reliable Home Energy Storage, Save Your Electricity Bills

overseas warehouse

Thailand

Bangkok

Coverage throughout Thailand and the Mekong River Basin.

Vietnam

Ho‑Chi‑Minh

Covering Vietnam and providing local after‑sales support.

Philippines

Manila

Island transshipment, on‑demand micro‑grid support for islands.

Cambodia

Phnom Penh

Mekong River Hub Warehouse, rapid‑response service for off‑grid projects.

Our Certifications

SUNKWH products are certified to international standards including IEC 62619, IEC 61000, IEC 62040, UN38.3, and CE Marking.

CE Export Certificate

CE Export Certificate

Dangerous Packing Certificate

UN 38.3 Certification